e have completed hundreds of projects in the last twenty years. Some recent examples are listed below.

Sector
Client
Project
Details
Hydroelectric Peter Kiewit Sons Co. Ltd. on behalf of Columbia Power Corporation Keenlyside Power Plant Environmental management planning, permitting, and monitoring for construction of a powerhouse at the Keenlyside dam on the Columbia River.
BC Hydro Fish Use Diversions Habitat evaluations and fish utilization surveys with respect to water diversion into the Campbell River system.
BC Hydro Burrard Thermal Generating Station Review of potential imapcts of thermal plumes from the Burrard Thermal Generating Station on fish in Burrard Inlet.
Forestry Canadian Forest Products Dawson Creek Forest District Reconnaissance fish and fish habitat inventories covering 20,000 ha.
Babine Forest Products Decker-Stearns 1:20,000 Fish and Fish Habitat Assessment Inventory of fish and fish habitat in watersheds near Burns Lake, BC.
Canadian Forest Products Ltd. Prince George and Fort St. James

-Stream classification.
-Environmental planning and monitoring for stream crossing construction

Mining and Smelting Cominco Ltd. Columbia River Water Quality Reporting on 1995 and 1999 sediment and water quality monitoring in the Columbia River near Trail, BC.
Placer Dome Inc. Cerro Crucitas Baseline fisheries survey of a gold mine site in Costa Rica
Placer Dome Venzuela SA Las Cristinas Baseline fisheries and mercury contamination assessment of rivers on a mine site in south eastern Venezuela
Oil & Gas Westcoast Energy   Environmental protection planning for pipeline maintenance at stream crossings in the Liard, Peace, and Coquihalla drainages.
Civil Construction Peter Kiewit Sons Co. Ltd. on behalf of Greater Vancouver Regional District Cleveland dam seepage control Environmental protection planning for installation of a cutoff wall up to 43m below the surface of the Capilano drinking water reservoir.
Bird Construction Surrey Memorial Hospital expansion Monitoring construction site effluents.
Peter Kiewit Sons Co. Ltd. on behalf of RTP 2001 Grandview Cut sections of the Sky Train extension Preparation of an Environmental Management Plan and compliance monitoring.
First Nations Carrier Sekani Tribal Council and Burns Lake Band Endako Flow Investigations of chinook and kokanee populations in the Endako River, BC and the feasibiltiy of flow controls to enhance spawning and incubation success.
Carrier Sekani Tribal Council Salmon analysis Pilot study of the quality of salmon caught in the traditional fisheries of the Carrier Sekani.
Sto-Lo Fisheries Steelhead and Cutthroat surveys Working with members of Sto-Lo community to survey genetics and migration in cutthroat trout, rearing densities of juvenile steelhead an escapement of adult steelhead.
Government Fisheries and Oceans Canada Habitat Requirements of BC freshwater fish

Prepared a database of standardized habitat requirements for all species of fish from BC lakes and streams for use in an impact assessment procedure.

BC Resource Inventory Committee Fish and Fish Habitat Inventory training program Preparation of Reconnaissance 1:20,0000 Fish and Fish Habitat Inventory training course.
BC Minsitry of Water Land and Air Protection Lower Mainland Wild Steelhead Conservation Program

A five year program of investigations to support conservation efforts including:
-collection and review of existing informaion on six major steelhead producing systems
-map based habitat capability assessments
- annual surveys of adult steelhead returns
- recommendations for cost-effective long term monitoring strategies

Public Works Canada Shakwak Project An assessment of fish populations and habitats at Alaska Highway stream crossings between White River and the Alaska border.